Travelex Currency Exchange — Flexible & Curved installation by ETA Visual at Changi Airport T2, Singapore
Flexible & Curved

Travelex Changi Airport T2 – Curved LED Display Installation

A local airport-retail delivery combining custom curved and straight LED sections, night-access installation and cloud media-player commissioning.

Changi Airport T2, Singapore

Curved and straight LED sections delivered for an operating Changi Airport Terminal 2 currency-exchange counter.

Solution
Flexible & Curved
Location
Changi Airport T2, Singapore
Scope
Supply, installation & commissioning

More angles

Travelex Currency Exchange — view 2 — Flexible & Curved installation by ETA Visual
Travelex Currency Exchange — view 3 — Flexible & Curved installation by ETA Visual

Project Planning Considerations

Planning Considerations

  • For a custom curved LED section, confirm the actual wall geometry through site measurement and review the resulting dimensions and drawings with the factory before production.
  • For an operating airport-retail site, sequence removal, preparation, cabling, structure adjustment, installation and handback around the actual permitted non-busy/night access periods.
  • Commission the media player, LED control system, output resolution and secured network connection together, then include manager training, support contacts and an appropriate on-site spares strategy in handover.
Explore Airport & Public-Space LED Solutions

Project Overview

ETA Visual supported a Malaysian display company as the Singapore local delivery and installation partner for Travelex Currency Exchange at Changi Airport Terminal 2. The existing store was being upgraded with a custom curved LED section matched to its curved wall, alongside straight LED sections, local commissioning and subsequent service support.

Local Delivery for an Operating Airport Retail Counter

The project was an upgrade inside an operating currency-exchange store at Changi Airport Terminal 2. ETA Visual worked as the local Singapore delivery and installation partner, coordinating on-site work, commissioning and later service support with the display company supplying the project.

Because the store remained operational, the delivery method had to fit the airport-retail environment rather than treating the screen as an isolated supply item. Access, removal work, site preparation and the final handback were planned with the operating counter in mind.

Verifying the Curved Wall Before Custom Production

The store included an existing curved wall, so the curved LED section could not be treated as a standard flat layout. ETA Visual completed three site visits to measure and verify the curve before the required dimensions and drawings were reviewed with the factory.

Once the custom curved section was produced, it was air-freighted from China to support the required programme. The project combined that curved section with straight LED sections so the overall digital display followed the store’s intended architecture.

  • Measure the actual curve and surrounding interfaces before issuing factory drawings.
  • Confirm curved and straight section interfaces before production and logistics are committed.
  • Align custom-production lead time and freight method with the operational site programme.

Night-Access Installation and Site Coordination

Installation was arranged during non-busy periods, including night work, while the store continued operating. The on-site installation was completed over approximately four days through coordination between ETA Visual, the main contractor and the operating environment.

The main contractor removed the existing display, prepared the work area and coordinated the power, network cabling, structure adjustment and final screen curvature with the LED installation team. This sequencing helped keep the physical interfaces, display geometry and access plan aligned.

Project at a Glance

Project locationTravelex Currency Exchange, Changi Airport Terminal 2
ETA Visual roleSingapore local delivery, installation, commissioning and support partner
Display layoutCurved and straight LED sections
Curve verificationThree site visits before production
Installation approachApproximately four days during permitted non-busy/night periods
Content workflowClient-provided cloud media player commissioned with LED control

Engineering Challenges & Solutions

Challenge 1

A curved wall required verified geometry

The Challenge

The new display had to follow an existing curved architectural surface, so an assumed radius or generic curved-cabinet layout could create a visible mismatch.

ETA Visual's Solution

ETA Visual measured and checked the curve over three site visits, then reviewed the resulting dimensions and drawings with the factory before custom production.

Challenge 2

The airport counter remained operational

The Challenge

The project had to be delivered without treating the retail counter as a vacant construction site.

ETA Visual's Solution

Removal, preparation, LED installation and final adjustment were coordinated around permitted non-busy/night periods and completed over an approximately four-day on-site sequence.

Challenge 3

Cloud publishing needed to work with the LED system

The Challenge

The client needed its existing cloud media-player workflow to operate reliably through the new display and the site network.

ETA Visual's Solution

ETA Visual commissioned the client-provided cloud media player with the LED control system, verified output-resolution matching and coordinated network connection with the client IT team after firewall controls were strengthened.

Commissioning, Handover and On-Site Readiness

At commissioning, the media player and LED control system were brought online together, content playback was tested and the client’s IT coordination was completed around the required network controls. The goal was a practical publishing workflow for routine content updates after handover.

ETA Visual provided a delivery checklist, trained the store manager on basic operation and troubleshooting, and shared support contact information. LED modules, receiving cards and power supplies were stored on site to support practical maintenance readiness.

Why the Delivery Worked

1

Measured geometry before production

Three site visits established the curved-wall geometry before dimensions and drawings were reviewed with the factory.

2

Sequenced local airport delivery

Removal, preparation, installation and final adjustment were planned around permitted non-busy/night periods for an operating counter.

3

Commissioned operating workflow

The cloud media player, LED control system, network connection, handover checklist, manager training and on-site spares were coordinated as one usable system.

Delivered Outcome

  • Curved and straight LED sections were installed for the Travelex Changi Airport Terminal 2 counter upgrade.
  • The client-provided cloud media player was commissioned with the LED control system and tested for routine content playback.
  • The store received a documented handover, basic operational training, support contacts and locally stored LED service spares.

Frequently Asked Questions

ETA Visual LED display and AV system project backdrop
Let's Talk

Ready to light up
your space?

Tell us about your space and we'll get back with a free, no-obligation site survey and recommendation.

WhatsApp
+65 8038 9034
Email
perry.peng@etavisual.com
Office
12 New Industrial Road, #02-02C, Morningstar Centre, Singapore 536202

Click to upload or drag & drop

Up to 5 files · 8MB each · PDF, images, docs

We use your details and any files to reply to this enquiry and arrange the requested work. Please do not upload passwords or unrelated sensitive data. Privacy Notice

More Flexible & Curved projects